Construction Engineering

civil engineering question and need an explanation and answer to help me learn.

For Question 1,
– Use a line spacing of 1.5 and 12-point Times New Roman or an equivalent font type and size
– A 3-page max report length.
Requirements: As what it required
1  CE 414: Construction Engineering ASSIGNMENT 1 (2 weeks; 15% Final Grade) Due: Tuesday, January 31, 2023 1. The pre-construction planning process to solve a construction problem consists of five steps: problem formulation – feasibility study – preliminary planning – detailed planning – implementation. The main purpose of taking these steps is to work out the full details of the best solution by providing necessary information (e.g., project goal, objectives, constraints, preliminary cost estimation and project duration, etc.) to a design phase. You will search the Internet to find the schematic design report of any public infrastructure project and summarize the project information in your report. The project information to be summarized in your report includes 1) project description (e.g., goal, scope, existing information, etc.), 2) project constraints (e.g., technical, cost, time, political, etc.) 3) the list of design standards which were considered for the design of your project, and 4) preliminary construction cost if applicable. 2. Look up one example of value engineering on the Internet, and discuss the example in one-page maximum.

Place this order or similar order and get an amazing discount. USE Discount code “GET20” for 20% discount